Project: 25 Trego Road, E9
Our Trego Road project saw a significant milestone achieved today with our tower crane being erected. Having a 30m tower height and a 40m jib length the tower crane will make it much easier and safer for the site workforce to carry out their daily lifting tasks throughout the construction phase.
Trident Lifting Solutions Ltd. were appointed by CMT Construction to supply the tower crane and driver with our groundworks subcontractor Konform initially utilising it before CMT Construction take it over later in the year.
The project will consist of ground and basement commercial spaces and 52 residential units above over 5 levels, enjoying public spaces on the ground floor and a collection of gardens and balconies throughout the upper terraces.