Leytonstone

Project Description

The project is located in Leytonstone High Road which is miles away from 2012 Olympics. The was a two storey existing listed building and previous contactor knocked the walls down without planning .consent and the local authority took an enforcement action to the client.The client approached to us and we took over the project as a design and built. We re design the building and submitted new detailed planning application for the project, as soon as our proposal is accepted we finished the structural design and start construction project.

The proposal is erection of three storey steel frame building with basement. There is ground floor and basement commercial and 8 no luxury residential flats above. The property has an access to plenty of buses, and also only half a mile away from Leytonstone over ground and a mile away from Leytonstone underground station.

madani-school-3-popup

MADANI SCHOOL

Project Description

Client:   Awesome Company
Location:   Mountain View CA 94043
Surface Area: 450,000 m2
Year Completed:   2014
Value: $250.000
Architect:   Jason & Perry

The Langham Hotel located in Mountain View is one of the most CA’s largest hotel  with over 450,000 square feet of new construction. Complete interior renovation included removing walls, new restrooms, paint, wall coverings, tile and carpeting.

The Challenges

Madani Secondary Girls’ School founded in September 1991, is a Secondary Independent School. This property is a grade ll listed building Situated in the East End of London, it serves the local community in order to full fill the demands of an school in Tower Hamlets and the surrounding areas.

CMT has been awarded with internal refurbishment, decoration and replacing all external sash windows to match existing.  A room located on top of the roof terrace, which is part of the original building that was unused space and proposed to renovate it into a study space for the tutors.

The newly installed windows were built with security and thermal insulation in mind. Constructed with light – weight aluminium, it provides a clean and stylish finish to the building.

After completing the project successfully. CMT has been awarded with the second contract, which is exterior restoration, including external boundary walls of the school providing a safer environment for education.

madani-school-3-popup