Project Background
Demolition of the existing building and garages for the construction of a residential building
With 15 dwellings including 1xstudio, 3×1 bedroom, 8×2 bedroom and 3×3 bedroom duplex and triplex units with highway access and associated works.

Project Location
6 Elms Road, Clapham London SW4 9EU.

Project Partners
Employer: John Vetch House Ltd
Main Contractor: CMT Design & Construction Ltd
Architect: Structural Engineer: Ackman Architecture + Design
Structural Engineer: JMS Civil & Structural Consulting Engineers
M&E Design: BSEC Building Services Engineering Consultants

Project Duration: 30 January 2018 – 31 August 2019